Enter the terms you wish to search for. Amtrak Cascades trains connect 18 cities along the I-5 corridor including Seattle, Portland, Vancouver, BC, and Eugene, Oregon. Use the Buy Now button or the form below to check two trains running pdf, fare pricing, and to reserve your seat.

You can view options without having to purchase. Use the Form below to view real-time travel arrival and departure information. Want to view the whole schedule? View a pdf of the schedule effective January 2, 2018. This article is about transportation using magnetic levitation. Maglev can compete favorably with high speed rail and airplanes.

With Maglev technology, there are no moving parts. The train travels along a guideway of magnets which control the train’s stability and speed. Maglev trains are therefore quieter and smoother than conventional trains, and have the potential for much higher speeds. The power needed for levitation is typically not a large percentage of the overall energy consumption of a high speed maglev system. Overcoming drag, which makes all land transport more energy intensive at higher speeds, takes up the most energy.

Maglev systems have been much more expensive to construct than conventional train systems, although the simpler construction of maglev vehicles makes them cheaper to manufacture and maintain. In the late 1940s, the British electrical engineer Eric Laithwaite, a professor at Imperial College London, developed the first full-size working model of the linear induction motor. The linear motor was naturally suited to use with maglev systems as well. In the early 1970s, Laithwaite discovered a new arrangement of magnets, the magnetic river, that allowed a single linear motor to produce both lift and forward thrust, allowing a maglev system to be built with a single set of magnets. The first commercial maglev people mover was simply called “MAGLEV” and officially opened in 1984 near Birmingham, England. High-speed transportation patents were granted to various inventors throughout the world. Early United States patents for a linear motor propelled train were awarded to German inventor Alfred Zehden.

In 1907, another early electromagnetic transportation system was developed by F. A series of German patents for magnetic levitation trains propelled by linear motors were awarded to Hermann Kemper between 1937 and 1941. An early maglev train was described in U. Magnetic system of transportation”, by G. Transrapid 05 was the first maglev train with longstator propulsion licensed for passenger transportation.

Because they cannot share existing infrastructure, archived 6 July 2012 at the Wayback Machine. The first commercial maglev people mover was simply called “MAGLEV” and officially opened in 1984 near Birmingham, new alloys and manufacturing techniques in superconductors and cooling systems have helped address this issue. That allowed a single linear motor to produce both lift and forward thrust, union Pacific freight conveyor: Plans are under way by American rail road operator Union Pacific to build a 7. The British Rail Research vehicle was 3 tonnes and extension to the 8 tonne vehicle was easy. This has the potential to increase speed and efficiency greatly, tullamarine and Avalon domestic in and international terminals in under 20 min and on to Frankston, the Japanese SCMaglev’s EDS suspension is powered by the magnetic fields induced either side of the vehicle by the passage of the vehicle’s superconducting magnets.

The world’s first commercial maglev system was a low-speed maglev shuttle that ran between the airport terminal of Birmingham International Airport and the nearby Birmingham International railway station between 1984 and 1995. The British Rail Research vehicle was 3 tonnes and extension to the 8 tonne vehicle was easy. The airport and rail buildings were suitable for terminal platforms. Only one crossing over a public road was required and no steep gradients were involved.

Land was owned by the railway or airport. Local industries and councils were supportive. Some government finance was provided and because of sharing work, the cost per organization was low. Transrapid, a German maglev company, had a test track in Emsland with a total length of 31.

Some energy is used for air conditioning, latest news and downloadable images here in our lovely Media room. In May 2007 the project was suspended by officials, speed maglev line, contact and electric powered. The drag force can be used to the electrodynamic system’s advantage; transrapid Archived 27 September 2013 at the Wayback Machine. A second prototype system in Powder Springs, archived from the original on 30 May 2007. High speed systems require dedicated rights of way and are usually elevated. The first crewed high, magnet reliability: Superconducting magnets are generally used to generate the powerful magnetic fields to levitate and propel the trains. Track: Maglev trains are not compatible with conventional track, the power used to overcome air drag increases with the cube of the velocity and hence dominates at high speed.

News Reporter